A steelworker bolting a girder high on a riveted steel frame, with the Manhattan skyline far below, 1930
Hand-coloured architect's elevation drawing of an eleven-storey office facade with arched windows, 1880s
Hand-drawn town plat dividing city blocks into numbered lots, some tinted pink and yellow, about 1810

SkaFld Site is in development. It is not available yet.

Home division: SkaFld.Capital · All nine products

SkaFld Site

In development

Construction from idea to keys: find and value a site, prove what you can build and whether it pencils, then plan, permit and manage the build, with the city and every trade partner on the same record.

The Star Theatre, New York, taken down floor by floor in 1901.

Licensed work

Construction work is done with licensed partners who hold the contractor license. SkaFld Site shows estimates, not an appraisal or investment advice, and does not act as a broker.

The problem

Deciding whether a lot or rebuild is worth doing takes weeks of scattered work: comps, zoning and hazard maps, code research, a buildable-area estimate and a pro forma in a spreadsheet nobody trusts. Once a project starts, permits, bids, budget, draws, change orders and inspections live in email and texts, and cost overruns are found too late.

Four plans, one per audience

  • SkaFld Site for Owners

    For owner-builders and rebuilding homeowners: feasibility, permit path and tracking.

  • SkaFld Site for Developers

    For spec builders, small developers and investors: deal screening, pro forma, max land bid and portfolio.

  • SkaFld Site for Builders

    For GCs and architects: estimating, trade partners, schedule, budget, draws, change orders and inspections.

  • SkaFld Site for Cities

    For partner cities: permit intake, plan check, inspector app, public status, and a verified record of contractors and trades. With SkaFld.Impact as the city partner.

How the work moves

8 steps, from Find to Exit.

  1. Find

    Paste a listing or address; Scout and Signals surface lots, teardowns and rebuilds that fit.

  2. Value

    Land comps by $/lot-sf, list-to-sale ratios and AVM cross-checks give a fair-value range.

  3. Check

    Zoning, overlays, fire and geohazard zones, permit history and the buildable envelope from city, county and state maps.

  4. Model

    Bear, base and bull pro forma: costs, financing, carry, exit, value ledger, Synthetic Balance Sheet and max land bid.

    Uses the Synthetic Balance Sheet
  5. Decide

    Executability gate and a diligence list ordered by what moves the numbers; offer or pass.

    Uses the Synthetic Balance Sheet
  6. Plan

    Design brief, permit application to the city, trade-partner and GC bids, lender term sheet.

  7. Build

    Schedule, budget vs actual, draws, change orders, trade partners, and inspections booked and passed with the city.

  8. Exit

    Sell, refinance or hold; outcome against the original model feeds the pattern library.

Where it sits

Every division decides on one shared, tested standard, and every product has one home division. SkaFld Site lives in SkaFld.Capital.

SkaFld Scout finds the opportunities

The shared front door for all four divisions. Every opportunity is scored on the Synthetic Balance Sheet, and the gate routes it to exactly one division.

  1. SkaFld.Ignite

    Build it.

      Ignite sells no products. It builds with SkaFld Build, an internal tool that is not for sale.

    • SkaFld.Capital

      Back it or buy it.

    • SkaFld.Elite

      Bring it to a client.

    • SkaFld.Impact

      Open it to the public.

    Fire insurance map of a city block, each building outlined and coded by construction type, 1908
    Lithographed map of Boston harbour with rail lines converging on the city from every direction, 1840s
    Engraving of the arcaded great hall of the Paris Bourse with traders gathered on the floor

    Interested in SkaFld Site? Talk to us.

    SkaFld Site is in development. Tell us what you would use it for.